|
|
||||||||||
|
|
![]() |
|
||||||||
|
|
||||||||||
|
|
||||||||||
|
|
||||||||||
|
|
Home Board of Directors Monthly Meeting Upcoming Meeting Technical Article Archive Newsletter Links Plumbing Contacts Downloads Contact Us |
|
Seismic Restraint of Suspended
Piping
presented by EH Price
In the field, seismic restraint systems must attach and
interface with numerous piping, ductwork, and electrical
systems. It is difficult if not impossible to specify locations
for these restraints prior to completion of the runs since the
routes of these systems frequently changes over the course of
construction. It is recommended that the seismic restraint be
installed after the installation of the mechanical and
electrical systems.
|
|
||||||
|
|
||||||||||
|
|
||||||||||
|
|
|
|
|
|
|
|
|
|
|
|